The High Court has dismissed a challenge to a 53,966-panel solar farm that would cover 28.6ha of land. Despite its size, as it will only generate 14.1MW, it is well below the nationally significant infrastructure project threshold and even below the prospsective 'development of national significance' threshold in Wales.